Toptube Video Search Engine



Title:Red-Purple Line Modernization: Bypass Track Slide
Duration:01:04
Viewed:3,926
Published:01-11-2021
Source:Youtube

The Walsh-Fluor Design-Build Team and Mammoet lift and move five spans of track approximately 35 feet into their permanent location for the CTA Red-Purple Modernization. The new structure was built adjacent to the existing tracks to limit interruption to service. The new track section largely completes the bypass portion of the Chicago Transit Authority’s Red-Purple Modernization, and CTA test trains are anticipated to begin running soon.



SHARE TO YOUR FRIENDS


Download Server 1


DOWNLOAD MP4

Download Server 2


DOWNLOAD MP4

Alternative Download :