Toptube Video Search Engine



Title:Port Talbot Level Crossing
Duration:03:46
Viewed:7,930
Published:29-09-2013
Source:Youtube

Saturday September 28 2013 at 10.50. The 9.35 Carmarthan to London (14.31) train pulling out of Port Talbot Parkway station. This is a 4 track crossing making it one of the biggest in the UK and the biggest in Wales. As the sign says, however, the road was closed in July 2011. Network Rail don't save any money by keeping the road closed as they still have to maintain the crossing for pedestrians. 3⅔ minutes of the wait for the train was cut out so the pedestrian waited a long time as the barrier was down for 7 minutes. 38,000 people live in Port Talbot and 655 use the station on an average day.



SHARE TO YOUR FRIENDS


Download Server 1


DOWNLOAD MP4

Download Server 2


DOWNLOAD MP4

Alternative Download :